-Staff meeting with DET Assets and Public Works 16 October to discuss Construction Services Flora and Fauna Report, timing for construction, access to the site, etc.
-Anticipate work commence before end of the year and be finalised mid 2015.
-Furniture requirements may be considered for future P&C fundraising goals.
·Creative Play Spaces:Major works commenced to complete
2.0Seating (above oval) and oval upgrade
3.0Earth mounds, drainage and mulching area above oval
Works include:
-Slab for Stage 2 seating completed; seating to be relocated and fixed
-Concrete seating at back of the oval formed up
-Swale well underway
-Batter constructed; has opened up the area above the field
-Subsoil drainage being installed
-Turf to be laid early November
-Might need working bee to tidy gardens and bush once works finished.
·Effective Learning Code:
-Parent forum proposed to discuss the results and preferred communication tools.Outcomes will contribute to the review of the school’s Effective Learning Code.
-Proposed date 5 November in place of SIFC meeting.Simon to confirm date and focus areas to be discussed.Ruth to propose process and facilitate.
-The revised Effective Leaning Code document will be provided at a future SIFC meeting.
General Business
·Enrolment Policy discussed; aligns with Department policy.Feedback provided.
Policy available on school website.
Meeting closed at 8.30pm.Next meeting – 5 November 2014 – Proposed Parent Forum